---
title: "ORSTED POWER (GUNFLEET SANDS) LTD - Payment Practices"
date: 2026-03-30
url: https://paymentcheck.co.uk/company-search/07680409/orsted-power-gunfleet-sands-ltd
description: "View payment practices for ORSTED POWER (GUNFLEET SANDS) LTD. Average time to pay: 19 days."
---

# ORSTED POWER (GUNFLEET SANDS) LTD

## Company Information

- **Company Number:** 07680409
- **Status:** Active
- **Company Type:** Private limited Company
- **Incorporated:** 23 June 2011
- **Registered Address:** 5 Howick Place, London, England, SW1P 1WG
- **Industry:** Professional Services
- **Region:** London

## Payment Statistics

- **Average Time to Pay:** 19 days
- **Invoices Paid Within 30 Days:** 67%
- **Invoices Paid Between 31-60 Days:** 33%
- **Invoices Paid Later Than 60 Days:** Not available%
- **Invoices Not Paid Within Agreed Terms:** 32%

## Payment Terms

- **Standard Payment Terms:** Standard contractual length of time for payment of invoices are 30 days from invoice received date. The maximum contractual payment period is 60 days from invoice day.
- **Shortest Payment Period:** 15 days
- **Longest Payment Period:** 60 days
- **Maximum Contractual Period:** 60 days

## Payment Practices

- **Payment Terms Changed:** Not available
- **Suppliers Notified of Changes:** Not available
- **E-Invoicing Offered:** True
- **Supply Chain Financing Offered:** False
- **Participates in Payment Codes:** No

## Dispute Resolution

"The Parties will attempt to settle any dispute between them by entering into good-faith negotiations through the appropriate management level of governance in a timely manner. The Parties must as a minimum attend the first good-faith negotiations.

If a dispute is not resolved by prior negotiation, any dispute arising out of or in connection with the Agreement, including any disputes regarding the existence, validity or termination thereof, shall be settled by arbitration in accordance with the provisions of the Rules of the London Court of International Arbitration provided that:

a) one (1) arbitrator will be appointed;
b) the arbitrator applies the laws of England;
c) the arbitration shall be conducted in the English language; and
d) be held in London, England.

Any arbitration proceedings and decisions under the Agreement are confidential."

## Summary

ORSTED POWER (GUNFLEET SANDS) LTD is a private limited company operating within the renewable energy sector, specifically associated with the Gunfleet Sands offshore wind farm development. The company forms part of the Ørsted group, a leading organisation in offshore wind energy.

The company was incorporated on 23 June 2011 and is registered in London, England, under company number 07680409. Its registered office is located at 5 Howick Place, London, England, SW1P 1WG, and it holds active status on the Companies House register.

As a power company connected to an offshore wind installation, this type of entity is responsible for the ownership, operation, and management of wind energy assets in UK waters. Such companies operate within the framework of UK energy regulation, generating and supplying electricity to the national grid from renewable sources.

Offshore wind companies of this nature play a significant role in the UK's transition to clean energy, contributing to national renewable energy targets. They operate under licences issued by relevant regulatory bodies and work within established industry standards governing the generation and distribution of electrical power.

---

*Data sourced from official UK government payment practices reports. Last updated: 2026-03-30*